Bathroom Renovations in Brisbane
A full bathroom renovation in Brisbane typically costs $20,000 to $35,000 for a mid-range job, about $27,000 typical. Basic renovations with budget fittings run $10,000 to $20,000, and premium bathrooms $35,000 to $55,000. The size of the room, whether the layout moves, and the tiles and fixtures you choose decide where you land. Tell us about your bathroom and one QBCC-licensed, insured local renovator will measure and quote it.
Updated November 2026
Bathroom Renovations prices
- Basic renovation (budget fittings)$10,000–$20,000
- Mid-range renovation$20,000–$35,000 (about $27,000 typical)
- Premium renovation$35,000–$55,000
Published Brisbane price ranges, not a quote. Your price is confirmed in writing before any work starts.
Get my free quoteFinished bathroom examples


Example bathrooms (licensed stock photos), not jobs by the renovator you are matched with. Ask the renovator for photos of their own recent work.
Signs it is time for bathroom renovations
- Cracked or drummy tiles, or grout that keeps going mouldy
- Water stains below the bathroom or on the other side of the wall
- A dated layout that doesn't suit how you live now
- A bath nobody uses that could be a bigger walk-in shower
- You're getting ready to sell or rent the place out
What does a full bathroom renovation include?
Strip-out and disposal, any framing or sheeting repairs, plumbing and electrical rough-in, waterproofing to AS 3740, screeding and tiling, then fit-off: vanity, toilet, shower screen, tapware, lights and exhaust fan. A good quote lists each of these stages with a price.
The biggest cost jump comes from moving things. Keeping the toilet, shower and vanity where they are saves on plumbing. Moving them, or turning a bath into a walk-in shower, adds to it.
Bathrooms in Queenslanders and older timber homes
A lot of Brisbane bathrooms sit on timber floors, in Queenslanders, post-war homes on stumps and raised homes that were built in underneath. A timber floor has to be stiff and properly prepared before waterproofing and tiling, or the tiles crack and the membrane fails. Ask how the floor will be prepared and expect it to be priced in the quote.
Bathrooms added downstairs in a built-in Queenslander are a different job again: slab, drainage falls and ceiling height all matter. Mention it on the form so the renovator comes prepared.
How long does a bathroom renovation take?
Most full bathroom renovations take three to five weeks of work on site, longer for bigger or custom jobs. Waterproofing needs time to cure before tiling, and good renovators don't rush that stage. Ask for a stage-by-stage timeline in the quote.
Licences, contracts, deposits and home warranty
In Queensland, any building work over $3,300 must be done by a QBCC-licensed contractor, and plumbing needs a licence at any price. Jobs over $3,300 need a written contract and Queensland Home Warranty Scheme cover. The maximum deposit is 10% up to $19,999 and 5% from $20,000, so most full bathroom renovations have a 5% cap.
How much does bathroom renovations cost in Brisbane?
| Job | Typical Brisbane price |
|---|---|
| Basic renovation (budget fittings) | $10,000–$20,000 |
| Mid-range renovation | $20,000–$35,000 (about $27,000 typical) |
| Premium renovation | $35,000–$55,000 |
| Luxury renovation | $55,000–$80,000 |
Published Brisbane price ranges (GST incl.) from whatsthedamage.com.au, not our quote. Room size, layout changes, access, floor type, and the tiles and fixtures you choose decide your price, and it is confirmed in writing before work starts. Prices are published ranges from whatsthedamage.com.au (verified Nov 2026), not quotes. See every job in the Brisbane bathroom renovation cost guide.
The standard we ask of every renovator we refer you to
The renovator does the work, not us. Ask for each of these in your written quote and contract.
- A renovator with a current QBCC licence for the work, and public liability insurance (certificate on request)
- Waterproofing to AS 3740 by a licensed waterproofer, with a certificate you keep
- Plumbing by a licensed plumber and electrical work by a licensed electrician
- A written, itemised quote: demolition, waterproofing, tiling, fixtures and labour listed
- A written contract for any job over $3,300, with no more than the legal maximum deposit (10% up to $19,999, 5% from $20,000)
- Queensland Home Warranty Scheme cover arranged by the renovator on jobs over $3,300
- Photos of the waterproofing before it is tiled over, and a walk-through at handover
Photos of the waterproofing, and a written scope
Waterproofing is hidden under the tiles once the job is done. You get photos of the membrane before tiling and the waterproofing certificate, plus a written scope before anything starts.
Licensed, insured renovator, public liability certificate on request
A bathroom done properly, by licensed trades
A bathroom that looks good but leaks behind the tiles means paying twice. That's why every job we pass on goes to a QBCC-licensed, insured Brisbane renovator who agrees to this standard before they get the work.
QBCC-licensed for the job
In Queensland, building work over $3,300 needs a QBCC licence, and plumbing needs a licence at any price. Jobs only go to renovators who hold the right licences and insurance. You can check any licence on the QBCC website.
Waterproofing done properly
Waterproofing is the cheapest part of a bathroom and the most expensive to get wrong. It is done to AS 3740 by a licensed waterproofer and photographed before it is tiled over.
An itemised price first
You get the scope and price in writing, broken down by stage, before work starts, so quotes compare fairly.
The right contract and deposit
A written contract for jobs over $3,300. The deposit can't be more than 10% up to $19,999, or 5% from $20,000, under Queensland law.
Home warranty cover
For residential work over $3,300 the renovator must take out Queensland Home Warranty Scheme cover on your behalf and include the premium in the price.
A realistic timeline
You get a start date and a stage-by-stage timeline, including curing time for the waterproofing, so you know how long you'll be without a bathroom.
Left clean
Ask for demolition waste to be taken away, dust controlled, and the house left clean at the end of each day and at handover.