Stafford 4053
Bathroom Renovations in Stafford
Stafford and Stafford Heights have lots of post-war homes on stumps, many of them raised and built in underneath over the years. That means two common jobs: renovating the original upstairs bathroom, and adding or upgrading a bathroom downstairs. One QBCC-licensed, insured local renovator quotes both across Stafford.
Updated November 2026
Stafford prices
- Basic bathroom renovation (budget fittings)$10,000–$20,000
- Luxury bathroom renovation$55,000–$80,000
- Waterproofing$700–$3,500
- Plumbing rough-in$2,000–$5,000
Published Brisbane price ranges (GST incl.), not a quote. Your price is confirmed in writing before work starts.


Example bathrooms (licensed stock photos), not jobs by the renovator you are matched with. Ask the renovator for photos of their own recent work.
Adding a bathroom downstairs
A downstairs bathroom in a built-in house sits on a slab, so drainage falls, ceiling height and how the waste pipes connect to the sewer all matter. If the space was built in without approval, sort that out before adding a wet area. The renovator will check the drainage on site before quoting.
The upstairs bathroom on a timber floor
Upstairs bathrooms in these homes usually sit on timber floors. The floor is checked and prepared before waterproofing, and any rot from old leaks is repaired first. That preparation should be listed as its own line in the quote.
How much does a bathroom renovation cost in Stafford?
| Job | Typical Brisbane price |
|---|---|
| Basic bathroom renovation (budget fittings) | $10,000–$20,000 |
| Mid-range bathroom renovation | $20,000–$35,000 |
| Premium bathroom renovation | $35,000–$55,000 |
| Luxury bathroom renovation | $55,000–$80,000 |
| Ensuite renovation (3–5 m², same layout) | $15,000–$30,000 |
| Waterproofing | $700–$3,500 |
| Tiling, supply and lay (floor and walls) | $2,800–$7,500 |
| Plumbing rough-in | $2,000–$5,000 |
| Demolition and disposal | $1,000–$3,000 |
| Vanity, supply and install | $500–$3,500 |
| Frameless shower screen, installed | $800–$2,500 |
| Freestanding bath, installed | $1,500–$5,000 |
| Toilet, supply and install | $400–$1,200 |
| Heated towel rail, installed | $350–$1,200 |
Prices are published ranges from whatsthedamage.com.au (verified Nov 2026), not quotes. See the full Brisbane bathroom renovation cost guide for sources and what changes the price.
The standard we ask of every renovator we refer you to
The renovator does the work, not us. Ask for each of these in your written quote and contract.
- A renovator with a current QBCC licence for the work, and public liability insurance (certificate on request)
- Waterproofing to AS 3740 by a licensed waterproofer, with a certificate you keep
- Plumbing by a licensed plumber and electrical work by a licensed electrician
- A written, itemised quote: demolition, waterproofing, tiling, fixtures and labour listed
- A written contract for any job over $3,300, with no more than the legal maximum deposit (10% up to $19,999, 5% from $20,000)
- Queensland Home Warranty Scheme cover arranged by the renovator on jobs over $3,300
- Photos of the waterproofing before it is tiled over, and a walk-through at handover
Photos of the waterproofing, and a written scope
Waterproofing is hidden under the tiles once the job is done. You get photos of the membrane before tiling and the waterproofing certificate, plus a written scope before anything starts.
Licensed, insured renovator, public liability certificate on request
Services in Stafford
Stafford bathroom renovation questions
In Queensland, building work over $3,300 needs a QBCC-licensed contractor, a written contract and home warranty cover. Check a renovator's licence (QBCC).